Typical Track Before & After Conditioning on Race Day:

post event   post event

Don't settle for a dust-filled, less-than-best show; use the Cracker-Blade system to assure multi-lane, virtually dust-free conditions for every event! Note! The photos above represent both the before and after application of the SUN & WIND SHIELD treatment (the Cracker-Blade was not used).

The SUN & WIND SHIELD treatment (when applied after conditioning the track surface with the Cracker-Blade, watering, and wheel-packing) delivers safer side-by-side racing, prevents lock-down, and virtually eliminates airborne dust.

This slightly tacky, water-based 100% biodegradable compound is easy to apply, environmentally friendly, and will be completely consumed by microscopic organisms (returning the track to the green state) within 4-5 days. Additionally, tire life is greatly increased. During multi-day shows a lighter mix is sufficient after the full strength application on the first day.




Please click on pictures for a larger, clearer version.


The following pictures demonstrate the track's integrity two days after a full racing schedule (having conditioned the test track with the Cracker Blade system):

post event post event post event post event
post event post event post event post event
post event post event post event post event


The following pictures show the Cracker Blade's conditioning first-hand:

grader conditioning grader conditioning grader conditioning grader conditioning



The following photos show the watering process after conditioning the track with the Cracker-Blade and the track's surface integrity after completion of the 06/30/06 World of Outlaws Sprint Series Wichita Twister Showdown show at 81 Speedway.

The following pictures are from the World 100 at Eldora Speedway, 09/09/06

world 100 7:49 7:20 8:10
8:16 9:12 9:12 9:23
9:26 10:25 10:25 10:46

Home About Photos Benefits Steps